Year, 1971
Preliminary studies including Tehran’s socio-economic and traffic condition and forecast up to 1991 began by Sofretu and RATP.

Year, 1974
Final report with a so-called (street-metro) proposal was tendered.
The street-metro system recommended a road network with a loop express way in the central area and 2 highways for new urban areas and a 7-line metro network which were complemented by bus network and taxi services.

Year, 1975

Ratification of the law of “Establishment of Tehran Urban & Suburban Railway Co. (Metro)”.

Sofretu Map

Year, 1976
Beginning of the Geological, land surveying and executive studies.

Years, 1980 - 86
Construction was stopped due to imposed war.

Year, 1995
Contract for E & M for Lines 1, 2 and 5.  

Year, 1999
Tehran - Karaj suburban line (Line 5) was officially inaugurated.

9 Urban Lines

Year, 2000
Mobilization of the western part of Line 2 between Sadeghieh and Imam Khomeini stations.

Year, 2001
Line 1 from Darvazeh Dolat to Ali abad with 8.5 km length was mobilized.

Year, 2002
  • Putting into operation of Line 1 from Mirdamad to  Darvazeh Dolat with 6.5 km length.

  • Putting into operation of Line 1 from Ali abad to Shahr-e-Rey with 3.9 km length.

  • Mobilization of West Terminal.

Year, 2003
Putting into operation of Line 1 from Shahr-e-Rey to Haram-e-Motahar with 6.9 km length.  

Year, 2004
Putting into operation of Line 2 from Imam Khomeini to Baharestan with 2 km length.  


Year, 2005
  • Putting into operation of Iran Khodro station (Line 5)

  • Putting into operation of Line 5 from Karaj to Golshahr with 10 km length.

  • Putting into operation of Chitgar station (Line 5)

  • Putting into operation of Baghershahr station (Line 1)

  • Putting into operation of Fath abad Terminal

Year, 2006
  • Putting into operation of  Line 2 (East part) with Elm o Sanat, Sar sabz and Shahid Madani stations.

  • Putting into operation of Sabalan & Darvazeh shemiran stations (Line 2)

  • Putting into operation of Nezam abad & Golbarg stations (Line 2)

  • Putting into operation of Atmosfer station (Line 5)

  • Putting into operation of Imam Hossein (AS) station (Line 2)

Year, 2007
  • Putting into operation of Ekbatan station (Line 5)

  • Putting into operation of Shohada station (Line 1)


 